59.4 F
Naperville
Saturday, April 27, 2024

Naperville Municipal Center entry reconstruction scheduled to begin July 6

-

Above / Steps and accessible ramp outside the main entrance will be rebuilt to comply with ADA standards.

city-hall-refections-web-DSC_5425
Watch for alternate side of the steps entry to City Hall beginning July 6, 2016.

Pending weather or unforeseen circumstances, reconstruction work on the main level entry way to the Naperville Municipal Center, 400 S. Eagle St., will begin on Wednesday, July 6. This project will require visitors to use alternate means to enter the building. The entry way to the Municipal Center was identified in the City’s 2015 Facility Transition Plan as being in need of reconstruction to bring it up to Americans with Disabilities Act (ADA) standards.

Between July 6 and 15, the right half of the exterior entry stairs, wheelchair ramp and garden box will be demolished to make way for a safer and more accessible entry way to the Municipal Center.

During this time, the left half of the stairway will still be useable but visitors will have to approach the stairs around the west end of the fountain as the sidewalk immediately leading to the Municipal Center will be closed.

From July 15 to August 12, the left half of the staircase leading to the front doors of the Municipal Center will be demolished as well rendering the entire main level entry to the Municipal Center inaccessible.

city-hall
Note the option to enter on the north side of the Municipal Center where it faces the DuPage River.

Visitor and accessible parking spaces at the Municipal Center will be moved to the lower level of the parking deck at the onset of this project. All accessible parking spaces will be against the building at the north end of the lot. The normal row of visitor spaces will be expanded to include the pull-through spaces behind them. Signs will be in place indicating the new parking configuration.

Work will be conducted 7AM to 4PM on weekdays and the project is scheduled to be completed by August 30.

To view the Facility Transition Plan, visit www.naperville.il.us/acd.

For more information on the City of Naperville, visit www.naperville.il.us. To sign up for the City’s notification system Naper Notify and receive important information via a phone call, text message, email or smart phone app, including traffic alerts, visit www.napernotify.com.

Stay Connected!

Get the latest local headlines delivered to your inbox each morning.
SUBSCRIBE
- Advertisement -
City of Naperville
City of Napervillehttp://www.naperville.il.us.
About Naperville: Located 28 miles west of Chicago, Naperville, Ill., is home to approximately 145,000 people. This vibrant, thriving City consistently ranks as a top community in the nation in which to live, raise children and retire. The City is home to acclaimed public and parochial schools, the best public library system in the country, an array of healthcare options and an exceptionally low crime rate. Naperville has ready access to a variety of public transportation, housing and employment options. The City’s diversified employer base features high technology firms, retailers and factories, as well as small and home-based businesses. Residents also enjoy world-class parks, diverse worship options, the opportunity to serve on several City boards and commissions, a thriving downtown shopping and dining area, a renowned outdoor history museum known as Naper Settlement and an active civic community. For more information, please visit our website at www.naperville.il.us.
spot_img

LATEST NEWS

DON’T MISS OUT!
GET THE DAILY
SQUARE-SCOOP
The latest local headlines delivered
to your inbox each morning.
SUBSCRIBE
Give it a try, you can unsubscribe anytime.
close-link

Stay Connected!

Get the latest local headlines delivered to your inbox each morning.
SUBSCRIBE
close-link